Monday, December 12, 2005

NEW : Grey Stripes Sock Project (& FF&L Update)

On Saturday, very spontaneously, I decided to start a new pair of socks. It suddenly occurred to me that I needed a small project to work on when I was out & about. Case in point - I had a hair appointment Saturday afternoon (color, weave & cut) which would be about 2 1/2 to 3 hours long, of which a good bit of that time would consist of just sitting around "processing." So the light bulb went off in my head and voila!, a sock project was born. This would be real simple to work on under the hair dryer. The catch was, could I cast on & get started before it was time to leave for my appointment? (I use the magic loop, 1 circ-2 socks method and it does take a bit of time to get the cast on down pat). In addition, I had a skein that I needed to divide into 2 balls. I'm using Reynolds Swizzle, in a grey with red, blue & green stripes (#4042 colorway).

The 1 skein to 2 balls process took me about 45 minutes. I must admit, I did have help from the "peanut gallery," (Scooter & Cleo).










I first had to wind the skein into a ball. Then I had to divide that ball in half, trying to get two equal balls. Here are the 2 balls eye-balled for "sameness." The left one is good to go.




Because I want the yarn running in the same direction (ie: same patterning sequence), I had to rewind the right ball. Here are the two completed balls of yarn.



Now the hard part - casting on using the magic loop method, 2 socks at a time. The picture below shows 75% of the cast on completed - 32 stitches for the 1st sock and 64 stitches for the 2nd sock.




This picture shows the completed cast on. The remaining 32 stitches of the 1st sock are now cast on.




5 rounds of the cuff are completed. Basic ribbing for cuff: K2, P2






The cuff after 10 rounds and 20 rounds, respectively. Cuff now complete. Scooter likes what she sees.






I am experimenting with using the bamboo stitch for the leg. 3 rounds in the pattern have been completed in the following picture.




*******************************************

FF&L: % Complete as of Monday, 12.12.05

WORKING ON 4TH REPEAT OF CHART 2 (4 rounds to go)

Four rounds knit since my last update --> 126 total rounds completed.

• 53,088 stitches cumulative (3,680 stitches since my last update)
• 39% of body completed (2% since my last update)
• 33% of entire shawl completed, including edging (2% since my last update)

Friday, December 09, 2005

QUICK & EASY Finished Objects

As we did last year, we will be having a holiday gift exchange at work. For our holiday luncheon, we will be taking a cruise out on the bay. It will be freezing cold, but fun.

I made this hat & scarf for Jodi. I think it will suit her quite well. She likes to ski, so hopefully she'll get some use out of this.



THE PARTICULARS

Hat
1 skein (+ a tiny bit of a 2nd skein) Lion Boucle in the Taffy #930-213 colorway
US 9 circular needles - knit in the round
Basic stockinette stitch
Start: Friday, 12.02.05
Finish: Saturday, 12.03.05
Estimated Time: about 2 hours

Scarf:
2 skeins Lion Boucle in the Taffy #930-213 colorway
US 10.5 circular needles
Basic garter stitch, knit until no yarn left
Start & Finish: Friday, 12.02.05 <--> Saturday, 12.03.05
Estimated Time: about 2 hours

*******************************************

This pretty blue scarf was made for Marianne. It's nice & fluffy and quite warm!! I know she's going to love this.





THE PARTICULARS

Scarf:
2 skeins Moda Dea Fur Ever in the Blue Heaven #3841 colorway
US 10.5 circular needles
Basic garter stitch, knit until no yarn left
Start & Finish: Monday am before work and pm after work, 12.05.05
Estimated Time: 2 hours --> NOW THAT'S QUICK!!!

*******************************************

Last but not least is this pink scarf I made for myself. This was my "take a break from the Frost Flowers & Leaves shawl" project. I needed some mindless knitting, and this wonderful pink color was calling my name. I didn't realize it at first, but there are "sparkles" in this. Pretty cool!!



THE PARTICULARS

Scarf:
2 skeins Moda Dea Zing in the Icy Pink #1724 colorway
US 10.5 circular needles
Basic garter stitch, knit until no yarn left
Start & Finish: I forget, but it was towards the end of November 05 sometime...
Estimated Time: probably about 2 hours

*******************************************

Here's a picture of these 4 projects thrown together just because I felt like it.

FF&L: % Complete as of Friday, 12.09.05

WORKING ON 4TH REPEAT OF CHART 2 (8 rounds to go)

Thirteen rounds knit since my last update --> 122 total rounds completed.

• 49,408 stitches cumulative (11,016 !! stitches since my last update)
• 37% of body completed (9% since my last update)
• 31% of entire shawl completed, including edging (7% since my last update)


Here's the blob, looking at it from the underside.




It makes a convenient holder for my yarn & row counter!




••close up of the flower pattern••




••close up of the leaves pattern••

Thursday, November 24, 2005

Caplotis C'est Finis

My second Clapotis is finished.
Yarn: Just over 5 Skeins Patons Grace, Tangello
Needle: US 6 (4mm) circular needle
Pattern: Clapotis
Structure: Incr/Decr Section: 8 repeats; Straight Section: 16 repeats
Total Stitches: 30,614
Time: 6 days (11.17.05-11.23.05)




I also began a scarf yesterday, for something quick & easy. I really needed a break from the FF&L shawl, which I have not worked on for about a week now. It's become a daunting project due to the sheer size of the thing. I'm just over a quarter of the way through, but there is so much more left to do. It's very overwhelming. I figured I'd extend my break from FF&L a little longer by making this scarf. I may add the darker pink to the light pink to make one big long scarf, or I may just make 2 separate scarfs. I'm not quite sure yet.

Friday, November 18, 2005

Splitz Top is "Splitz" (& FF&L Progress)

I decided to frog the Splitz Top I had been working on. I just was not happy with it and I found that there were too many errors in the pattern which I really did not want to deal with. (The errata did not catch one of the glaring errors, so I decided it just was not worth my time). Here it is in all its glory in the frog pond...



Besides that, I've got the Clapotis bug again so I started my second one last night using the yarn from the Splitz Top. I am using Patons Grace in Tangello, size 6 US (4mm). It's a 100% mercenized cotton and I like the way it is knitting up.



I'm only through row 109 on the Frost Flowers & Leaves shawl. That translates to only one row of the FF&L knit all week!!! I needed to take a break from it but will get back to it this weekend. Here are my usual stats on my progress...

FF&L: % Complete as of Friday, 11.18.05

WORKING ON 3RD REPEAT OF CHART 2 (5 rounds to go)

One round knit since my last post --> 109 total rounds completed.

• 38,392 stitches cumulative (792 since last Thursday)
• 28% of body completed (0% since last Thursday)
• 24% of entire shawl completed, including edging (1% since last Thursday)

Sunday, November 13, 2005

FINALLY Finished



Well, I finally finished the pair of socks which I had started over a year ago, October 2004, during the World Series watching the Red Sox. However, I did not like the way the pattern was turning out, so I frogged the whole thing and did not start this pair again until several months later. This time I did just a basic stockinette pattern. But I put this down many, many times to work on other things, so did not finally finish it until now - OVER A YEAR SINCE THE ORIGINAL START DATE!!! Wow - I cannot believe that in a year's time, I only completed ONE pair of socks. In the 2 years prior to that, I had probably knit over 20 pairs of socks - talk about "sockknitters block..." This pair was knit with Plymouth Sockotta on size 1 US (2.5mm) Addi Turbo circular needles using the magic loop method on a base of 64 sts. I think the colorway is called Mexico.

Needless to say, I have not worked on FF&L at all this weekend.

Friday, November 11, 2005

FF&L: % Complete as of Thursday, 11.11.05



I finally switched to 29" circs, although I didn't need to. I think I could have gone several more rounds, but I wanted to be able to take some better pictures. These pics are with 2 circs - 1/2 of the sts on the 24" & 1/2 on the 29". I took the pictures during the transition round from the 24" to 29". What better opportunity to be able to spread it out a little bit for the camera...Pretty, huh????

WORKING ON 3RD REPEAT OF CHART 2 (6 rounds to go)

Three rounds knit since my last post --> 108 total rounds completed.

• 37,600 stitches cumulative (2,312 since Monday)
• 28% of body completed (2% since Monday)
• 23% of entire shawl completed, including edging (1% since Monday)

Kitty Time



Ok - what can be cuter than this? --A kitty in a box-- No, make that...A kitty in an itty bitty box. Jazz-Purr can barely fit in the box, yet he has to get in it and check it out just the same. I guess he thinks he's a lot smaller than he looks. Granted, he's under 8 pounds, but to try to make this box his bed? I don't think so...Does he think no one can see him? I don't think so..Isn't he just the cutest? I DO think so...

And I bet you all are wondering what was in this box that created such a stir. It's a universal dock for the soon to be delivered 60gb white video iPod that Jacob ordered. Lucky boy. And thank-you Steve Jobs for your continuous innovation & vision. GO APPLE!!!! Yep - you got it - I'm a huge Apple fan. Have been since 1991 when I used my first mac. It was the SE, the teeny tiny little box with a whopping 8k of memory, if I remember correctly.

Ok - time to give Jazz-Purr's sisters some attention. Cleo & Scooter, it's your turn to take center stage. Scooter is the tabby & Cleo is, well, uh-hummm, just Cleo. Being a tortie she has what you would call - tortietude...She takes full advantage of any attention she can get. She even nudges her way in to get that attention when someone else is at the receiving end. She thinks she's Queen of the house. She also has to go eat or drink when ever the other 2 kids are doing that. Miss little bossy nudge-nick. But, you gotta love her!!! Scooter is our little lady. She's the quiet one, but don't get on her bad side. She'll certainly put you in your place. I guess that's why when Jazz wants to play, Cleo is usually the one he bothers (I mean plays with).



Thursday, November 10, 2005

Pictures of FF&L (through round 105)



Due to popular demand, here are some progress pictures of FF&L. This is through round 105 (midway through the 3rd repeat of chart 2). It's still on the 24" needles and is about 2 rounds into the second hank of Alpaca Cloud-Peppermint.

I told you it was just a blob...although you can make out the center flower motif.

Alpaca Cloud Update on FF&L

For those of you keeping stats:

My first hank of Alpaca Cloud got me through approximately 33,500 stitches (about 3/4 of the way through round 103) of the Frost Flowers & Leaves shawl. If that holds true through out my shawl, that would put me at about 4.8 hanks needed for this project. Keep in mind that I am using smaller needles than the pattern suggested (size 3 us; 3.25mm). This is supposed to knit up to a huge shawl and I wanted mine to be somewhat smaller. I am, after all, only about 5'1" tall.

I'm still using the 24" length needles but may switch to the 29" soon. That way I can spread out the shawl a tiny bit more to get some pictures. I have the 29" in INOX, but I think that's the longest they go, so I'll have to use my 40" Addi Turbos once I outgrow the 29". The problem with the Addi's is that their tips are more blunt than those of the INOX. I like to use pointy tips for lace. Oh well, at least this pattern does not call for any K3TOG. It's at that point where you really want to use pointy needles. The only other problem I can foresee with the Addi's will be that they will be real slippery. That would be a complete disaster if my stitches fell off the needles.

I'll try to stretch out my blob of peppermint to take some pictures so you can get an idea of how things are coming along. As you know with lace, until you have blocked your project, you really cannot get a true picture of how things are progressing -- except by the size of the blob.

Jacob becomes a Bar Mitzvah: Part B-Reception

My friend from work, Marianne, just sent me these pictures of the reception. You can see what a great time everyone had.



Here's my very handsome boy...If you look closely enough, you can see his dimples!



Here's Steve & me...{VERY PROUD PARENTS}


More pictures will be forthcoming. I'm just waiting to get them from our photographer.

Wednesday, November 09, 2005

Jacob becomes a Bar Mitzvah: Part A-Friday Night

Jacob became a Bar Mitzvah on Saturday, November 5, 2005. He was absolutely spectacular. He did such a wonderful job, both with his Torah & Haftorah readings as well as his D'var Torah. Everyone is extremely proud of him. All the years of religious school & Hebrew school & the weekly study sessions for the 6 months leading up to his Bar Mitzvah certainly paid off.

Below are some pictures from Friday night, November 4, 2005. During Friday night services, Jacob's two grandmothers and I led the candlelighting and Jake led the Kiddush. Afterwards, we all went over to the club house at my Mother-in-Law's for dinner with all of our out of town guests. (Actual Bar Mitzvah pictures from Saturday are still to come).

The Bar Mitzvah Boy - Jacob





Jacob & his brother, Adam




Jacob's cousin, Zachary


A family gathering for dinner after Friday night services






FF&L: % Complete as of Tuesday, 11.08.05

WORKING ON 3RD REPEAT OF CHART 2 (9 rounds to go)

Ten rounds knit since my last post --> 105 total rounds completed.

• 35,288 stitches cumulative (6,488 since last Wednesday)
• 26% of body completed (5% since last Wednesday)
• 22% of entire shawl completed, including edging (3% since last Wednesday)

Wednesday, November 02, 2005

FF&L: % Complete as of Tuesday, 11.01.05

WORKING ON 2ND REPEAT OF CHART 2 (2 rounds to go)

Eight rounds knit since my last post --> 96 total rounds completed.

• 28,800 stitches cumulative (5,180 since last Wednesday)
• 21% of body completed (3% since last Wednesday)
• 18% of entire shawl completed, including edging (3% since last Wednesday)