Friday, February 24, 2006

Frost Flower & Leaves (after blocking)




***************************************************
STATS: Frost Flowers & Leaves
Pattern: Frost Flowers & Leaves from the book, A Gathering of Lace
Time: Start - Sept 25, 2005 // Finish - Feb 02, 2006 (about 4 1/2 months)
Yarn: Knitpicks Alpaca Cloud, Peppermint --> not quite 4 hanks
Needles: Circular, size 3 US, (3.25mm) using a variety of lengths (16", 24", 29", and 40"); Inox for the first 3 lengths & Addi Turbos for the 40"
Cast-On: Magic Loop
Chart 2 Pattern Repeats: FIVE
Edging: Pattern change - right cable rather than wrapped stitch
Dimensions: 51" x 51"

Tuesday, February 21, 2006

It's Blocking...Need I Say More?!





FLOWER BASKET SHAWL

Knits-N-Purrs Gallery

I am in the process of creating another blog, Knits-N-Purrs Gallery, an on-line knitting journal to chronical my finshed projects along with details & notes specific to each project. Initial posts will also include items non-knit related, but crafty just as well, so that I can get all my projects on line in one place.

They're here!!!

My blocking wires arrived today so hopefully I will be able to block my Flower Basket Shawl this afternoon after work. GOLD medal here I come...

Once FBS is blocked, I'll block the Frost Flowers & Leaves Shawl.

Monday, February 20, 2006

Knitting Olympics Lace Event - going for gold

I finished the Flower Basket Shawl this weekend. I was able to manage 14 repeats out of the yarn, with just a little left to spare. Whew!! That was close -- a photo finish, I would say. The picture below shows the bit of yarn left over.



And here are some pictures before blocking. I hope to do the blocking within the next day or so. I had ordered some blocking wires 2 weeks ago, so expect those to arrive any day. If not, I'll just have to block her with pins. Afterall, in order to win GOLD, my project needs to be completely finished (see rules here) by the time the olympic flame goes out. That includes darning in all ends and blocking.






***************************************************
THE KNITTY GRITTY
Pattern: Flower Basket Shawl, (a Fiber Trends pattern by Evelyn Clark)
Time: Cast on - Feb 10, 2006 // Cast Off - Feb 19, 2006
Yarn: KnitPicks Essential in DUSK --> 3 skeins
Needles: Circular, size 6 US (4.0 mm), using a variety of lengths (16", 24" and 32"); Clover Bamboo for the two smaller sizes, Susan Bates-Silverado for the 32"
Cast-On: Figure 8
Lower Flower Basket Chart: FOURTEEN repeats
Extra Note: Knit for the Knitting Olympics, Team USA - Lace

Success - at last!

Cleo finally decided to try out the felted kitty bed I made. She has slept in it a couple times, so I guess it will be a keeper. Jazz-Purr has also tried it out once or twice. Scooter is the only one who has yet to try. (She's the one sleeping in the background).




Jazz -Purr (my oh-so-sweet little boy)



Friday, February 17, 2006

A Judge's Review

I just "re-judged" my stitch count on my Flower Basket Shawl & I think I will be OK after all with 14 repeats rather than just 12. I am almost finished with the 12th repeat and I still have a little bit left of my 2nd skein. I had thought I would not even get through repeat 11 with this skein. I had started my 2nd skein on row 78 of the lower basket chart, but when I looked at my stitch count, I looked at repeat 7, row 8, but I actually should have looked at repeat 8, row 8, based on how I am counting my rows. In other words, row 78 means I have finished the entire repeat #7 and am on the 8th row of the 8th repeat. So what does this all mean?

Instead of the first skein getting me through 9,300 stitches, it actually got me through 11,300 stitches. That means my second skein should get me through about the 2nd row of repeat 13 and then I should have plenty of yarn left to get through the 14th repeat. My 3 skeins should be able to knit a total of about 33,900 stitches and total stitches for my shawl are only about 31,100 stitches.

Based on a 14 repeat shawl, I am about 69% complete which should put me in great running for a medal. I will be able to complete this before the Olympic flame goes out. HOORAY!!!

Thursday, February 16, 2006

Knitting Olympics - Day 6



I am coming along nicely on the Flower Basket Shawl. I am through the 6th row of the 11th repeat of the lower basket chart. However, I think I am only going to be able to complete 12 repeats before I start the edging. If I go any farther, I think I will run out of yarn, and I do not think I can get any more before the olympic flame goes out. One skein got me through about 9,300 sttiches. I am nearing the end of my 2nd skein (I only have 3 total) and I have knit about 18,100 stitches, or about 8,800 for the 2nd skein. That means I have about 500 stitches left with this skein, which would get me through about 2 more rows, not even completing the 11th repeat. With 14 repeats, I calculated about 31,100 total stitches for the shawl, but at my current run rate, I can only get about 27,900 sttiches out of the 3 skeins I have. With 12 repeats, the completed shawl will be about 24,700 so that looks like what I will have to go for. Based on the 12 repeats, I am about 73% complete.

Tuesday, February 14, 2006

Knitting Olympics - Day 5

My Flower Basket Shawl for the Knitting Olympics is coming along quite nicely. I have just completed the 8th repeat of the lower flower basket chart. The pattern calls for only 7 repeats, but I wanted a larger shawl, so I am going to go with either 12 or 14 repeats. If I do 12 repeats, then I am 48% complete. If I go for 14 repeats, I would be 38% complete. I'll see how it goes. I'm using KnitPicks Essential & really like this yarn. It has a nice spongy feel to it.

This has turned out to be an extremely easy knit. Maybe too easy for the olympics? My biggest challenge is completing this on time, so I guess it still counts.

Felted Kitty Bed

I finished the kitty bed but I am not too happy with the felting results. I washed the thing FIVE times and it still did not felt all that much. I used Lionbrand Landscapes yarn and will NOT be using this yarn again for felting. It did not live up to its labeling for felting. It also took DAYS to dry.

Here's the finished product. Not only did the felting give me trouble, but none of my 3 cats even want to use it. See how Scooter is lying outside the bed??



**************************************************
The Specifics
Pattern: Felted Kitty Bed
Time: Cast on--> 02.03.06 // Cast off--> 02.06.06
Yarn: 6 skeins-Lionbrand Landscapes, Spring Desert & a partial skein-Lion Brand Fun Fur, Light Blue
Needles: Size 10 (6.0mm) Clover bamboo circulars (Maybe if I had used a larger needle it would have felted better??)

Tuesday, February 07, 2006

Overzealous recipient

Gosh - Jazz-Purr is certainly anxious. He's already using his kitty bed & it was not even off the needles!!! I put it down for 2 seconds, and Mr. Jazz-Purr came strolling in, as determined as could be, and crawled right into the darn thing. At least I know he's appreciative of all my hard work!!!








I finally coaxed him out and binded off. Pre-felting dimensions are about 18" high and 20" wide. I'm hoping to get some time this evening to felt it. I'll post pictures post-felting once it's done.

Monday, February 06, 2006

Team USA - Lace

I just joined Team USA, specifically, the lace team. It has all the same rules as Yarn Harlot's Knitting Olympics, but as the name suggests, it is for US olympians only. I'm going to start training tonight after work by making a couple gauge swatches to help me decide what needle size I'm going to use for the Flower Basket Shawl.

I am currently working on a felted kitty bed from Wendy.

I ordered some blocking wires today, so once I receive them, I can block FF&L.

Thursday, February 02, 2006

Frost Flowers & Leaves - FINISHED!!!

As the header suggests, I have finished the FF&L shawl. It took a little less than 4 hanks of KnitPicks Alpaca Cloud and a little less than 4 1/2 months. The picture below is the shawl before blocking. It currently measure about 37" x 37". I'll probably do the blocking this weekend.



STATS: Frost Flowers & Leaves
Pattern: Frost Flowers & Leaves from the book, A Gathering of Lace
Time: Start - Sept 25, 2005 // Finish - Feb 02, 2006 (about 4 1/2 months)
Yarn: Knitpicks Alpaca Cloud, Peppermint --> not quite 4 hanks
Needles: Circular, size 3 US, (3.25mm) using a variety of lengths (16", 24", 29", and 40"); Inox for the first 3 lengths & Addi Turbos for the 40"
Cast-On: Magic Loop
Chart 2 Pattern Repeats: FIVE
Edging: Pattern change - right cable rather than wrapped stitch

***************************************************
As far as what to work on next: I have a pair of Jungle Stripes socks OTN that I have not worked on because I was enjoying the FF&L shawl way too much to stop... So, I'll work on those for a while until next Friday, when I'll begin the Flower Basket Shawl for the Knitting Olympics. I'm going to use KnitPicks Essential sock weight yarn in dusk.

Monday, January 30, 2006

The Home Stretch (no pun intended)==>FF&L

I'm on the home stretch, the last side of the edging, fast approaching THE END... All that will be left is the "stretch" part - the blocking. I should complete the knitting by the end of this week, I would think, barring any major catastrophe. Then I'll have to figure out how to block this thing. I'm really not looking forward to that, as I am not that great at blocking.

Thursday, January 26, 2006

Wednesday, January 25, 2006

Edging Along on Frost Flowers & Leaves

I am busy knitting away on the edging...still. I've reached the halfway mark. Hooray!!! The edging is extremely relaxing to knit - it just takes a tremendous amount of time. I'm guessing it will probably take me about 2 more weeks to finish up unless I miraculously get a huge chunk of time in which to knit (which I very much doubt). I started with a full hank of the Alpaca Cloud so it will be interesting to see if it will get me through the entire edging or if I will need to start a 2nd one.




The inspection committee was out in full force this morning...

Thursday, January 19, 2006

Jazzy In-a Bag

Someone stole my knitting bag. Who can it be??? Well, it's my deliciously cute knitting buddy, Jazz-Purr -- my sweet, sweet devonrex.









Here's a picture of the edging for the FF&L shawl. I just completed the first side, and considering the fact that this is a square shawl, that means I am 25% of the way through.




I joined today. Opening ceremonies begin 02.10.06 and the games will last for 16 days. I chose to compete in the Flower Basket Shawl marathon. That means I have to begin, complete AND block the shawl in 16 days in order to be a contender. Let the games begin.....!

Sunday, January 15, 2006

Edging for FF&L

I am now working on the edging for the Frost Flowers & Leaves shawl. If I calculated correctly, the edging will take about 21,600 stitches. For the rows where you are suppoed to PU a stitch for the wrap, I am doing a cable instead. I did the wrap stitch, but this did not look as clean as I wanted it to so I switched to a cable. This does not look that great either, but hopefully when the shawl is blocked, it will look close enough to the picture in the book.

FF&L shawl body complete

F&L: % Complete as of Sunday, 01.08.06

FINISHED CHART 3: BODY COMPLETE!!!!!

Thirteen rounds knit since my last update --> 162 total rounds completed.

• 91,016 stitches cumulative (14,408 stitches since my last update)
• 100% of body completed (16% since my last update)
• 81% of entire shawl completed, including edging (13% since my last update)

Wednesday, January 04, 2006

FF&L - 3rd hank

Just a quick update that I forgot to add yesterday. I started the 3rd hank of the Alpaca Cloud (peppermint) about a quarter of the way through round 138. That's at about 65,000 total stitches, so I am guessing that I will use almost 5 complete hanks (@ 440 yds each) by the time I finish this shawl.

Tuesday, January 03, 2006

FF&L Update: Working on Chart 3

FF&L: % Complete as of Tuesday, 01.03.06

WORKING ON CHART 3 (13 rounds to go)

Fourteen rounds knit since my last update --> 149 total rounds completed.

• 76,708 stitches cumulative (14,844 stitches since my last update)
• 84% of body completed (16% since my last update) {adjusted for 5 chart 2 repeats}
• 68% of entire shawl completed, including edging (13% since my last update) {adjusted for 5 chart 2 repeats}

Note: I ended up knitting only 5 repeats of chart 2, rather than the 7 repeats called for in the pattern.

Wednesday, December 28, 2005

FF&L Milestone

FF&L: % Complete as of Wednesday, 12.28.05

WORKING ON 5TH REPEAT OF CHART 2 (11 rounds to go)

Nine rounds knit since my last update --> 135 total rounds completed.

• 61,864 stitches cumulative (8,776 stitches since my last update)
• 46% of body completed (7% since my last update)
• 39% of entire shawl completed, including edging (6% since my last update)

I may only knit 5 repeats of chart 2 rather than the 7 suggested by the pattern. This is a huge shawl, and being only 5'1" tall, I really do not need a huge shawl. I think it will be plenty big with only 5 repeats. I'll make the final decision once I complete the 5th repeat. Of course, all my % completion updates will change because the % will be based on a fewer number of stitches. I would actually be more like 55% complete (before edging) if I cut back on the number of repeats.

THE MILESTONE
I have finally reached 1,000 stitches on the needles of the FF&L shawl (rounds 133 & 134). Now, each time I complete a round, that's AT LEAST 1,000 more stitches completed!! Here's some pictures of the shawl at the 1,000 stitch per round juncture.








In the middle of round 129, I switched to size 40" needles (addi turbos), mainly because I wanted to spread the shawl out a little to get some good pictures.








It was the third night of Hannukah last night.

Wednesday, December 21, 2005

Grey Stripes Complete


I finished the grey stripes socks Monday, 12.19.05, in the morning, so wore them to work that very day!!! They are really comfortable - very cushiony - I think because of the bamboo stitch.

The Stats: GREY STRIPES SOCKS

64 stitches on size 1 US (2.5mm) addi turbos
Magic Loop method: 2 socks; 1 circ
Reynolds Swizzle (fingering weight)

cuff: 20 rounds: k2, p2
leg: 40 rounds: bamboo stitch
heel: 32 rows: eye of partridge stitch
gusset/instep: 58 rounds (bamboo stitch for instep; stockinette for sole)
circular toe

Start: 12.10.05
Finish: 12.19.05


Here's a picture of the socks right after the completion of the gusset decreases.




I've started another pair of socks. These will be out of Lorna's Laces in the Jungle Stripe colorway. I've finished 13 rounds of the cuff (K2,P2).



Thursday, December 15, 2005

Grey Stripes Progress

I had plenty of time to knit yesterday, as I did not go into work. (Sometimes it's nice to be sick...). I progressed nicely on my socks getting to just past picking up the gusset stitches.

I specifically chose a back & front for the socks because the striping using the bamboo stitch kind of disappears due to the length of the color stripe which is not quite long enough to go two complete rounds. It therefore kind of messes up the striping. I wanted the full effect of the striping to show up on the front of the sock. The leg is 40 rounds of bamboo stitch. Generally, when I knit socks, I usually knit only 30 rounds for the leg, but I wanted these socks a little longer because I always end up with a fairly good amount of sock yarn left over. (I still knit my usual 20 rounds for the cuff).

FRONT




BACK (note the disappearing stripes)




EOP HEEL (eye of partridge)




TURNED HEEL





GUSSET P/U: Last but not least, the gusset stitches are all picked up. This is where I have to resort to using two circs to complete this part. I then put the two socks back on one circular. I like to arrange the stitches so that I am now knitting the socks in profile.

Tuesday, December 13, 2005

It's all in the Bag

This is my sock project bag. Just thought I'd share...



It contains a row counter, a picture tutorial of the magic loop cast on, the Magic Loop book, notes I've jotted down during sock knitting, a pencil & paper (for the note taking), some patterns, a yarn cutter, markers, a few safety pins (I use one to mark the start of my round), a needle for the finishing process and two Addi Turbo needles, both size 1 US (2.25mm), although one is 40" & the other is 47" long. I start out with the 40" and then I use the the 47" when I have to p/u stitches and begin the gusset. I have not figured out how to do this part on just one circular. But - once I've picked up all the gusset stitches, I go back to using just the one needle. I prefer to use the 40" size for the socks and just use the 47" during the gusset phase. Working with the 47" during the actual knitting process was too cumbersome - the loops were just too big & got in the way.